中国IT动力,最新最全的IT技术教程
最新100篇 | 推荐100篇 | 专题100篇 | 排行榜 | 搜索 | 在线API文档
首 页 | 程序开发 | 操作系统 | 软件应用 | 图形图象 | 网络应用 | 精文荟萃 | 教育认证 | 硬件维护 | 未整理篇 | 站长教程
ASP JS PHP工程 ASP.NET 网站建设 UML J2EESUN .NET VC VB VFP 网络维护 数据库 DB2 SQL2000 Oracle Mysql
服务器 Win2000 Office C DreamWeaver FireWorks Flash PhotoShop 上网宝典 CorelDraw 协议大全 网络安全 微软认证
硬件维护  CPU  主板  硬盘  内存  显卡  显示器  键盘鼠标  声卡音箱  打印机  机箱电源  BIOS  网卡  C#  Java  Delphi  vs.net2005
  当前位置:> 网络应用 > 上网宝典
PMP认证考试试题精选(66)
作者:佚名 时间:2003-10-09 08:39 出处:互连网 责编:chinaitpower
              摘要:PMP认证考试试题精选(66)

  651. Using the WBS in the Special window, an instance of a work package is:
  A. Build house
  B. Excavate
  C. Prepare Foundation
  D. B and C
  E. None of the above
  ANS: E
  
  652. Using the problem stated in the Special window, Calculate the expected value of duration (in days) using the PERT concept of the expected
  duration of a task
  A. 8.0
  B. 8.8
  C. 9.1
  D. 9.7
  E. 10.5
  ANS: B
  
  653. Using the problem stated in the Special window, Calculate the deviation of duration for the task, using the PERT concept of standard
  deviation of task duration.
  A. 0.5
  B. 1.0
  C. 1.8
  D. 2.2
  E. 2.8
  ANS: C
  
  654. Using the situation stated in the Special window, what is the total variable costs for producing one widget?
  A. ,020
  B. ,010
  C. ,015
  D. .00
  E. None of the above.
  ANS: E
  
  655. Using the situation stated in the Special window, what is the total price variance for direct material?
  A. 0.00
  B. 6.00
  C. %content%.02
  D. -0.00
  E. 50.00
  ANS: B
  
  656. Using the situation stated in the Special window, what is the labor rate cost variance?
  A. 00.00
  B. 00.00
  C. -0.00
  D. -%content%.10
  E. 00.00
  ANS: D
  
  657. Using the situation stated in the Special window, what is net present value of an annual income flow of 00 at 14% over the next three
  years?
  A. 13.60
  B. %content%.68
  C. 80.00
  D. 6.19
  E. .32
  ANS: A
  
  658. Using the situation stated in the Special window, what is present value of 00 at 12% at the end of 5 years?
  A. 05.00
  B. %content%.57
  C. 7.00
  D. 2.86
  E. .61
  ANS: C
  
  659. Using the situation stated in the Special window, what is the cost variance for Case #9?
  A. -00
  B. 1000
  C. -2000
  D. 2000
  E. 0
  ANS: B
  
  660. Using the situation stated in the Special window, what is the schedule variance for Case #8?
  A. 1000
  B. 2000
  C. -1000
  D. -2000
  E. 0
  ANS: C
  
  
关闭本页
 
首页 | 投资与合作 | 服务条款 | 隐私政策 | 收藏本站 | 设为首页 | 新用户注册 | 免责声明 | 使用帮助
Copyright ©2005-2008 chinaitpower.com All rights reserved. www.chinaitpower.com 版权所有