中国IT动力,最新最全的IT技术教程
最新100篇 | 推荐100篇 | 专题100篇 | 排行榜 | 搜索 | 在线API文档
首 页 | 程序开发 | 操作系统 | 软件应用 | 图形图象 | 网络应用 | 精文荟萃 | 教育认证 | 硬件维护 | 未整理篇 | 站长教程
ASP JS PHP工程 ASP.NET 网站建设 UML J2EESUN .NET VC VB VFP 网络维护 数据库 DB2 SQL2000 Oracle Mysql
服务器 Win2000 Office C DreamWeaver FireWorks Flash PhotoShop 上网宝典 CorelDraw 协议大全 网络安全 微软认证
硬件维护  CPU  主板  硬盘  内存  显卡  显示器  键盘鼠标  声卡音箱  打印机  机箱电源  BIOS  网卡  C#  Java  Delphi  vs.net2005
  当前位置:> 网络应用 > 上网宝典
PMP认证考试试题精选(54)
作者:佚名 时间:2003-10-10 08:39 出处:互连网 责编:chinaitpower
              摘要:PMP认证考试试题精选(54)

  531. Line of balance charts are used most frequently in:
  A. Engineering
  B. Marketing
  C. Manufacturing
  D. Accounting
  E. Contracts and procurement
  ANS: C
  532. Project tradeoffs are usually made by comparing _____ and constraints.
  A. Time, cost, and quality
  B. Time, risk, and quality
  C. Risk, quality, and manpower availability
  D. Cost, quality, and technical performance
  E. Cost, quality, and risk
  ANS: D
  533. Standard "Shewhart" control charts assume that the distribution of sample means is:
  A. uniform
  B. normal
  C. discrete
  D. symmetrical
  E. B and D only
  ANS: E
  534. The type of power most infrequently used by the PM is
  A. formal authority
  B. reward power
  C. referent power
  D. expert power
  E. penalty
  ANS: A
  535. Which of the following is NOT a characteristic of message filtering?
  A. semantics
  B. media
  C. ethics
  D. organizational status
  E. reputation
  ANS: C
  536. Feasibility studies evaluate alternatives in terms of
  A. Cost-effectiveness
  B. Ease of performance
  C. Risk
  D. Safety
  E. All or part of A through D
  ANS: E
  537. Present value measures
  A. the value to us today of future cash flows.
  B. the rate of return on an investment when we take account of cash inflows and outflows
  C. the current estimates of our project budget
  D. the dollars worth of work accomplished as of today
  E. All of the above.
  ANS: A
  538. The Project Manager has the responsibility of knowing what kind of message to send because his _____ may avoid communications barriers.
  A. business interfaces
  B. output
  C. technical experience
  D. priorities
  E. training methods
  ANS: B
  539. The ability to reduce risk is _____ to how far you have progressed through the project life cycle.
  A. inversely proportional
  B. directly proportional
  C. not related
  D. the responsibility of the risk executive
  E. is directly proportional to the amount at stake.
  ANS: A
  540. The risk of accepting a lot of poor quality, in acceptance sampling, is referred to as:
  A. buyer's risk
  B. consumer's risk
  C. producer's risk
  D. type I error
  E. B and D only
  ANS: B
  
  
  
关闭本页
 
首页 | 投资与合作 | 服务条款 | 隐私政策 | 收藏本站 | 设为首页 | 新用户注册 | 免责声明 | 使用帮助
Copyright ©2005-2008 chinaitpower.com All rights reserved. www.chinaitpower.com 版权所有