中国IT动力,最新最全的IT技术教程
最新100篇 | 推荐100篇 | 专题100篇 | 排行榜 | 搜索 | 在线API文档
首 页 | 程序开发 | 操作系统 | 软件应用 | 图形图象 | 网络应用 | 精文荟萃 | 教育认证 | 硬件维护 | 未整理篇 | 站长教程
ASP JS PHP工程 ASP.NET 网站建设 UML J2EESUN .NET VC VB VFP 网络维护 数据库 DB2 SQL2000 Oracle Mysql
服务器 Win2000 Office C DreamWeaver FireWorks Flash PhotoShop 上网宝典 CorelDraw 协议大全 网络安全 微软认证
硬件维护  CPU  主板  硬盘  内存  显卡  显示器  键盘鼠标  声卡音箱  打印机  机箱电源  BIOS  网卡  C#  Java  Delphi  vs.net2005
  当前位置:> 网络应用 > 上网宝典
PMP认证考试试题精选(47)
作者:佚名 时间:2003-10-10 08:39 出处:互连网 责编:chinaitpower
              摘要:PMP认证考试试题精选(47)

  471. Ensuring that all work is both authorized and funded by contractual documentation is the responsibility of:
  A. The project manager
  B. The functional manager
  C. The project sponsor
  D. The client
  E. All of the above
  ANS: A
  
  472. Forecasting human resource requirements necessitates making predictions about both the supply and demand of human resources. Which of
  the following is not a method used to forecast the demand for human resources?
  A. Delphi Method
  B. Regression Analysis
  C. PERT Charts
  D. Staffing Tables
  E. Time Series Analysis
  ANS: C
  
  473. Free float is the amount of time that an activity may be delayed with out affecting the _____.
  A. Early start of the succeeding activities.
  B. Late start of the succeeding activities.
  C. Project finish.
  D. Cost of the project.
  E. None of the above.
  ANS: A
  
  474. Risks that cannot be identified or evaluated _____ .
  A. should be deflected to the contracting officer.
  B. should be handled via contingency allowances.
  C. should be ignored, since they cannot be identified.
  D. should be ignored, since they are not covered in the Risk Assessment.
  E. C and D
  ANS: B
  
  475. The five major cost categories of quality are _____ .
  A. prevention, appraisal, internal failures, external failures, and equipment (measurement and test).
  B. specifications, QA programs, QC programs, parts rejected and parts returned
  C. Staffing, Training, reviews, equipment and rejected goods
  D. sampling, design considerations, manufacturing considerations, training and rework.
  E. None of the above
  ANS: A
  
  476. The process of interpreting a message is:
  A. Decoding
  B. Receiving
  C. Encoding
  D. Feedback
  E. A and C
  ANS: A
  
  477. Which of the following is a formal invitation that requests a formal response that describes the method of work and associated compensation.
  A. Request for quotation (RFQ)
  B. Request for proposal (RFP)
  C. Request for bids (RFB)
  D. Invitation for bids (IFB)
  E. Letter of intent (LOI)
  ANS: B
  
  478. A program can best be described as:
  A. A grouping of related activities which last two years or more
  B. The first major subdivision of a project
  C. A grouping of projects, similar in nature, which support a product or product line and have no definable end point
  D. A product line
  E. Another name for a project
  ANS: C
  
  479. Cost of quality includes:
  A. Appraisal cost
  B. detection cost
  C. prevention cost
  D. maintenance cost
  E. A, B, and C only
  ANS: E
  
  480. Flextime and compressed workweeks are two popular alternative work schedules used by employers to improve the quality of work life of
  their employers. Which of the following statements concerning these alternative work schedules is not true?
  A. Flextime schedules alter the employee's working hours but not the number of hours worked each day
  B. Both flextime and compressed workweek schedules make scheduling more complex for the employer
  C. Both flextime and compressed workweek schedules can complicate compliance with overtime regulations
  D. Fatigue is a disadvantage of compressed workweek schedules because employees must work longer than the traditional eight hour work day
  E. Under flextime schedules, the working hours are established by the employer
  ANS: E
  
关闭本页
 
首页 | 投资与合作 | 服务条款 | 隐私政策 | 收藏本站 | 设为首页 | 新用户注册 | 免责声明 | 使用帮助
Copyright ©2005-2008 chinaitpower.com All rights reserved. www.chinaitpower.com 版权所有