中国IT动力,最新最全的IT技术教程
最新100篇 | 推荐100篇 | 专题100篇 | 排行榜 | 搜索 | 在线API文档
首 页 | 程序开发 | 操作系统 | 软件应用 | 图形图象 | 网络应用 | 精文荟萃 | 教育认证 | 硬件维护 | 未整理篇 | 站长教程
ASP JS PHP工程 ASP.NET 网站建设 UML J2EESUN .NET VC VB VFP 网络维护 数据库 DB2 SQL2000 Oracle Mysql
服务器 Win2000 Office C DreamWeaver FireWorks Flash PhotoShop 上网宝典 CorelDraw 协议大全 网络安全 微软认证
硬件维护  CPU  主板  硬盘  内存  显卡  显示器  键盘鼠标  声卡音箱  打印机  机箱电源  BIOS  网卡  C#  Java  Delphi  vs.net2005
  当前位置:> 网络应用 > 上网宝典
PMP认证考试试题精选(42)
作者:佚名 时间:2003-10-10 08:39 出处:互连网 责编:chinaitpower
              摘要:PMP认证考试试题精选(42)

  421. Project life cycles provide a better means of measurement of progress and control. The four phases of a project are conceptual development,
  _____, _____, and _____.
  A. Preliminary planning, detail planning, closeout
  B. Implementation, reporting, termination
  C. Development, implementation, termination
  D. Execution, reporting, finishing
  E. Implementation, termination, post-audit review
  ANS: C
  
  422. Response Planning is the responsibility of the functional areas and considers
  A. mitigation.
  B. deflection.
  C. contingency planning.
  D. unforeseen occurrences.
  E. All of the above.
  ANS: E
  
  423. The definitive terms of a contract are written during which of the following contract phases?
  A. Contract Phase
  B. Post-Award Phase
  C. Award Phase
  D. Pre-Award Phase
  E. Requirement Phase
  ANS: C
  
  424. The sending or conveying of information from one place to another is the process of
  A. Networking
  B. Transmitting
  C. Interacting
  D. Promoting
  E. Interfacing
  ANS: B
  
  425. Which of the following types of cost are relevant to making financial decisions:
  A. sunk cost
  B. opportunity cost
  C. material cost
  D. A and C only
  E. B and C only
  ANS: E
  
  426. In preparing a good project definition, experienced project managers will:
  A. Concentrate mainly on the end product rather than costs or benefits. These come later.
  B. Realize that only the "tip of the iceberg" may be showing. As a project manager, you must get beneath it.
  C. Understand that a project definition/plan is a dynamic rather than static tool, and thus subject to change.
  D. Try to convert objectives into quantifiable terms.
  E. All of the above
  ANS: E
  
  427. In which of the following is the cost of risk hidden by the contractor?
  A. Firm Fixed Price Contract
  B. Fixed Price Plus Incentive
  C. Cost Plus Fixed Price
  D. Cost Plus Percentage of Cost
  E. A and B
  ANS: D
  
  428. Management of a certain building was receiving complaints about slow elevator service. The solution adopted was to add mirrors in the
  lobbies to reduce boredom while passengers waited. This is an example of _____ .
  A. Kepner-Tregoe method
  B. Potential problem analysis
  C. Decision analysis
  D. Creative problem solving
  E. None of the above
  ANS: D
  
  429. Pure Risk differs from Business Risks because Pure Risk's _____ .
  A. include chances of both profit or loss associated with the business.
  B. include chances of loss and no chances for profit associated with the business.
  C. must incur personal loss with business liability.
  D. must incur business liability associated with loss of pure profit.
  E. B and C
  ANS: B
  
  430. The actual configuration of a PERT/CPM network _____ the amount of resources that can be devoted to the project.
  A. Increases.
  B. Is not affected by
  C. Does not require
  D. Is heavily dependent upon
  E. Is the only means of determining
  ANS: D
  