中国IT动力,最新最全的IT技术教程
最新100篇 | 推荐100篇 | 专题100篇 | 排行榜 | 搜索 | 在线API文档
首 页 | 程序开发 | 操作系统 | 软件应用 | 图形图象 | 网络应用 | 精文荟萃 | 教育认证 | 硬件维护 | 未整理篇 | 站长教程
ASP JS PHP工程 ASP.NET 网站建设 UML J2EESUN .NET VC VB VFP 网络维护 数据库 DB2 SQL2000 Oracle Mysql
服务器 Win2000 Office C DreamWeaver FireWorks Flash PhotoShop 上网宝典 CorelDraw 协议大全 网络安全 微软认证
硬件维护  CPU  主板  硬盘  内存  显卡  显示器  键盘鼠标  声卡音箱  打印机  机箱电源  BIOS  网卡  C#  Java  Delphi  vs.net2005
  当前位置:> 网络应用 > 上网宝典
PMP认证考试试题精选(38)
作者:佚名 时间:2003-10-10 08:39 出处:互连网 责编:chinaitpower
              摘要:PMP认证考试试题精选(38)

  381. On November 1, 00 worth of work on task A was supposed to have been done (BCWS); however, the BCWP was 0. Calculate the
  schedule variance:
  A. -100
  B. 100
  C. -150
  D. 150
  E. 0.85
  ANS: C
  
  382. The Quality Risk _____ .
  A. is minimized through continuous monitoring.
  B. is considered a long term risk.
  C. will be reflected in the in-service life of the project result.
  D. B and C
  E. All of the above.
  ANS: E
  
  383. The act of conducting or supervising the exchange of information is:
  A. Consulting
  B. Project Management
  C. Communications Management
  D. Communications Enhancement
  E. None of the above
  ANS: C
  
  384. The core function of the project manager is
  A. Systems design
  B. Client interfacing
  C. Quality assurance
  D. integration
  E.
  ANS: D
  
  385. The future value of an annual income flow of 00 for 2 years at 10% is:
  A. 2200
  B. 2280
  C. 2300
  D. 2310
  E. None of the above
  ANS: D
  
  386. The initial cost of a product and the product's operation and maintenance costs _____ .
  A. increases perceived value when balanced.
  B. are incidental to each other because initial costs are "sunk"
  C. decreases design costs as operation periods increase
  D. provides perceived function value and product social dysfunction
  E. are integrally related with each other because initial costs are "sunk".
  ANS: A
  
  387. All of the following may hinder a person's ability to transmit/receive a message except:
  A. Unfamiliarity with topic
  B. Withholding information
  C. Assuming
  D. Noise
  E. Preoccupation
  ANS: A
  
  388. Quality Improvement Programs are normally associated with which two of the following?
  A. Juran and Crosby
  B. Juran and Deming
  C. Crosby and Deming
  D. Deming and the Japanese
  E. Crosby and the Japanese
  ANS: D
  
  389. The Utility Theory _____ .
  A. considers risk propensity of the decision maker.
  B. attempts to formalize management's risk considerations.
  C. works well with decision tree analysis.
  D. is considered highly theoretical.
  E. All of the above.
  ANS: B
  
  390. The document authorizing functional areas to charge against the project is the:
  A. Work authorization form
  B. Scope baseline
  C. Project charter
  D. Management plan
  E. Linear responsibility chart
  ANS: A
  
  
关闭本页
 
首页 | 投资与合作 | 服务条款 | 隐私政策 | 收藏本站 | 设为首页 | 新用户注册 | 免责声明 | 使用帮助
Copyright ©2005-2008 chinaitpower.com All rights reserved. www.chinaitpower.com 版权所有