中国IT动力,最新最全的IT技术教程
最新100篇 | 推荐100篇 | 专题100篇 | 排行榜 | 搜索 | 在线API文档
首 页 | 程序开发 | 操作系统 | 软件应用 | 图形图象 | 网络应用 | 精文荟萃 | 教育认证 | 硬件维护 | 未整理篇 | 站长教程
ASP JS PHP工程 ASP.NET 网站建设 UML J2EESUN .NET VC VB VFP 网络维护 数据库 DB2 SQL2000 Oracle Mysql
服务器 Win2000 Office C DreamWeaver FireWorks Flash PhotoShop 上网宝典 CorelDraw 协议大全 网络安全 微软认证
硬件维护  CPU  主板  硬盘  内存  显卡  显示器  键盘鼠标  声卡音箱  打印机  机箱电源  BIOS  网卡  C#  Java  Delphi  vs.net2005
  当前位置:> 网络应用 > 上网宝典
PMP认证考试试题精选(34)
作者:佚名 时间:2003-10-10 08:39 出处:互连网 责编:chinaitpower
              摘要:PMP认证考试试题精选(34)

  341. Which of the following fall(s) under the responsibilities of a project manager?
  A. Labor relations with project personnel
  B. Affirmative action
  C. Personnel training
  D. Discrimination and equal employment opportunity
  E. All of the above
  ANS: E
  
  342. A legally binding document offered unilaterally is a _____ .
  A. purchase order
  B. scope of work description
  C. contract stipulation
  D. level of effort proposal
  E. request for proposal
  ANS: A
  
  343. A technical requirement has which of the following characteristics:
  A. easy to understand
  B. a communication tool between the user and the design team
  C. written in non-technical language
  D. developed in cooperation with the user
  E. typically describe physical dimensions and performance requirements
  ANS: E
  
  344. If a project manager communicates a verbal message to a subordinate, and the subordinate leaves without saying a word, the project
  manager should assume:
  A. the message was understood
  B. the message was not understood
  C. the subordinate discarded the information
  D. the information was not appropriate
  E. None of the above.
  ANS: E
  
  345. Inspection of a complex project according to specifications is accomplished by _____.
  A. inspection by attributes.
  B. cyclical inspection
  C. quality conformance inspection
  D. original inspection
  E. None of the above.
  ANS: C
  
  346. The behavioral responsibilities of a project manager may also include dealing with:
  A. The public
  B. Regulatory personnel
  C. The legal environment
  D. Environmental issues
  E. All of the above
  ANS: E
  
  347. The difference between the BCWS and the BCWP is referred to as the:
  A. Schedule variance
  B. Cost variance.
  C. Estimate of completion
  D. Actual cost of the work performed
  E. None of the above
  ANS: A
  
  348. "Paraphrasing" is most closely associated with which part of the communication process?
  A. encoding
  B. decoding
  C. barriers
  D. feedback
  E. None of the above.
  ANS: D
  
  349. A Gantt chart is useful in determining:
  A. the level of effort for a task
  B. when a task starts and stops
  C. how tasks are related to each other
  D. who is assigned to do a task
  E. All of the above.
  ANS: B
  
  350. A contract originated bilaterally may be developed by _____ .
  A. quotation request from suppliers
  B. proposal request
  C. bid invitation release
  D. B and C
  E. All of the above.
  ANS: E
  
  
关闭本页
 
首页 | 投资与合作 | 服务条款 | 隐私政策 | 收藏本站 | 设为首页 | 新用户注册 | 免责声明 | 使用帮助
Copyright ©2005-2008 chinaitpower.com All rights reserved. www.chinaitpower.com 版权所有